Ningxia Hanas Power Generation
All the people are still working for the annual periodical maintenance(minor inspection) during the Dragon Boat Festival
Posted on 2017-06-03 23:03
On July 19th, Hanas Ningxia East Thermal Power Plant Unit No.2 periodical maintenance (minor inspection) summary meeting was held in East Thermal Power Plant.
Posted on 2017-07-20 15:09
Orientation Drill through the Yellow River of Hanas Natural Gas Pipeline Tie line Project from Hangjinqi to Yinchuan’s...
On January 15th, 2018, the first safety meeting of the year was held. General manager Ms. Laing Wei...